news center
Production News Express
2024-01-10 views 195
On the morning of January 10, the "MAERSK REDWOOD", a 3,500TEU container ship built and delivered by our group's New Yangzi Shipbuilding for the shipowner Japan's LEPTA Company, unmoored and set sail from the shipyard dock and was put into operation of the MAERSK fleet.

"MAERSK REDWOOD" has a total length of 200 meters, a molded width of 36.4 meters, and a molded depth of 20.6 meters. It is classified into the ABS classification society. The ship was delivered via electronic signature. At about 10 a.m. on January 10, representatives from the shipowner, construction supervision team, ship inspection and shipyard gathered at the New Yangzi Shipbuilding Terminal to bid farewell to the maiden voyage.

2026.03.26
Delivery of 32,000 DWT Great Lakes Bulk Carrier "HEMUS" buil…
2026.03.16
Delivery and Departure of the fourth 75,000 DWT Oil Tanker "…
2026.02.13
Delivery and Departure of the second 50,000 DWT Oil Tanker "…
2026.02.11
Delivery of the first 83,300 DWT CABU Combination Carrier "B…
2026.02.07
Delivery of the first 9000TEU Methanol dual-fuel Container V…
2026.01.23
Successful Conclusion of 66,000 DWT Bulk Carrier built by Ya…
2026.01.19
Delivery of 66,000 DWT bulk carrier "UBON NAREE" built by Ya…
2026.01.13
Delivery and Departure of 50,000 DWT Oil Tanker "DELOS T" bu…
2026.01.12
Delivery and Departure of 50,000 DWT Oil Tanker “PAROS STAR…
2026.01.11
Delivery and Departure of 114,000 DWT Oil Tanker "LUCKNAM" b…