news center
Production News Express
2023-04-28 views 197
On April 26, the seventh and eighth 4600TEUcontainer ships, named "Zhonggu Changchun" and "ZhongguLanzhou," respectively, which were built by New Yangzi Shipyard under ourgroup for Zhonggu Logistics, were successfully delivered to the shipownerthrough electronic signature.
On the same day, both ships departed from the New Yangzi No. 1 Wharf and commenced their initial operations.
2024.09.24
Delivery and Departure of the Tenth LNG Dual Fuel 7000TEU Co…
2024.09.14
The first batch of 40,000 CBM Dual-Fuel LPG/ Ammonia Carrier…
2024.09.11
Delivery and Departure of the Fourth 1260TEU Methanol Dual F…
2024.09.02
Project Conclusion| Delivery and Departure of the Ninth 1600…
2024.08.29
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier …
2024.08.23
Delivery and Departure of 40000 DWT Bulk Carrier "APPIA" bui…
2024.08.22
Delivery and Departure of the Third 1260TEU Methanol Dual Fu…
2024.08.21
Delivery and Departure of 66,000DWT Wide-Beam Bulk Carrier "…
2024.08.06
Delivery and Departure of the Ninth LNG Dual Fuel 7000TEU Co…
2024.07.25
The 52000DWT Bulk Carrier "Huayuan 505" of Yangzijiang Shipp…